Texas Department of Transportation projects near Cottage Grove

Three projects that are in or near the Cottage Grove area. They are:
  1. Project #0912-70-906, the purpose of which is to do landscape development at various locations on IH-610 from US-290 to IH-10. The tentative letting date is September, 2011.
  2. Project #8170-12-006, the purpose of which is to construct an 8-lane divided (raised median) urban street facility on Washington/Hempstead to Washington-Katy split to IH-10. The tentative letting date is September, 2011.
  3. Project #8170-12-004, the purpose of which is to construct a detention channel (phase 1 of 2) along Hempstead Road at UPRR to White Oak Bayou. The tentative letting date is September, 2011.
 

What did you think of this article?




Trackbacks
  • Trackbacks are closed for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Enter the above security code (required)

 Name (required)

 Email (will not be published) (required)

 Website

Your comment is 0 characters limited to 3000 characters.